Saturday 10 June 2017

BED PREPARATION

Day 2 - Day8 (Date 2-06-2017 to 8-06-2017 )


On start of second day Mr.Lakshman Jadhav sir gave us a assignment of bed preparation and distributes all students in three groups.After that we took the measurements for preparing bed and went to market for material purchasing accordind to requirement of bed.


                       PREPARATION OF BED


Material used for preparation of bed :

1 . Square tubes
2 . Plywood
3 . Welding rods
4 . colour
5 . Touchwood
6 . Primer ( Redoxide )
7 . Brushes
8 . Thinner

fig.Prepared bed


Processes Performed During Bed Preparation :For bed preparation some processes are  performed as follows,


1 . Cutting
2 . Welding
3 . Grinding
4 . Painting
CUTTING

WELDING


WELDING

GRINDING

PAINTING

TABLE :  COST ESTIMATION

Material Cost :

Sr. no
Product name
Total products
Rate
Cost (Rs)
1
2* 1 tube
18 ft
19.5/ft
351
2
¾ * 3/4 tube
12.1 ft
8/ft
96.8
3
1.5 * 1.5 tube
7 ft
25/ft
175
4
Plywood
2.42*5.74 ft2
55/ft2
764
5
Welding rod
25
2.5/rod
62.5
6
colour
250 ml
250/1000ml
62.5
7
Touchwood
250 ml
300/1000ml
75
8
Primer
250 ml
180/1000ml
45
9
Brush
2 (2 inch)
50
100
10
Thinner
250 ml
140/1000ml
35


Labour cost is 15% of total material cost
Labour cost = 1767 * 0.15
                     =Rs  265

Electricity cost is 10% of total material cost
Electricity cost = 1767 * 0.10
                          = Rs 178

Therefore , total cost = 1767+265+178
                                    =Rs 2210

No comments: