Day 2 - Day8 (Date 2-06-2017 to 8-06-2017 )
PREPARATION OF BED
On start of second day Mr.Lakshman Jadhav sir gave us a assignment of bed preparation and distributes all students in three groups.After that we took the measurements for preparing bed and went to market for material purchasing accordind to requirement of bed.
PREPARATION OF BED
Material used for preparation of bed :
1
. Square tubes
2
. Plywood
3
. Welding rods
4
. colour
5
. Touchwood
6
. Primer ( Redoxide )
7
. Brushes
8
. Thinner
![]() |
fig.Prepared bed |
Processes Performed During Bed Preparation :For bed preparation some processes are performed as follows,
1 . Cutting
2 . Welding
3 . Grinding
4 . Painting
![]() |
CUTTING |
![]() |
WELDING |
![]() |
WELDING |
![]() |
GRINDING |
![]() |
PAINTING |
TABLE : COST ESTIMATION
Material Cost :
Sr. no
|
Product name
|
Total products
|
Rate
|
Cost (Rs)
|
1
|
2* 1 tube
|
18 ft
|
19.5/ft
|
351
|
2
|
¾ * 3/4 tube
|
12.1 ft
|
8/ft
|
96.8
|
3
|
1.5 * 1.5 tube
|
7 ft
|
25/ft
|
175
|
4
|
Plywood
|
2.42*5.74 ft2
|
55/ft2
|
764
|
5
|
Welding rod
|
25
|
2.5/rod
|
62.5
|
6
|
colour
|
250 ml
|
250/1000ml
|
62.5
|
7
|
Touchwood
|
250 ml
|
300/1000ml
|
75
|
8
|
Primer
|
250 ml
|
180/1000ml
|
45
|
9
|
Brush
|
2 (2 inch)
|
50
|
100
|
10
|
Thinner
|
250 ml
|
140/1000ml
|
35
|
Labour cost is 15% of total material cost
Labour cost = 1767 * 0.15
=Rs 265
Electricity cost is 10% of total material cost
Electricity cost = 1767 * 0.10
= Rs 178
Therefore , total cost = 1767+265+178
=Rs
2210